Trusted to deliver
Explore generator projects across a range of industries, from equipment supply and installation to ongoing maintenance in the UK and overseas.
Urgent Call to Collection-Ready in Under 48 Hours
A returning customer needed a 150kVA set at short notice.Read More
Bespoke 400kVA Generator Installation for Renewable Energy Company in Yorkshire
A Yorkshire renewable-energy business needed a higher-capacity replacement integrated into its existing installation, with practical access for cabling and maintenance.Read More
100kVA Cummins Backup Power for Berkshire Property Development
A Berkshire property developer needed commercial standby generation with switching arrangements for critical and life-safety applications. An electrical-solutions partner with previous Midlands projects coordinated the requirement.Read More
Multi-Site Generator Service & Maintenance for a National IT Service Provider
A national IT-services provider operates eight important locations across northern and southern Britain. The standby fleet is mainly around 500kVA, with Perkins engines and predominantly FG Wilson sets. YorPower's involvement began before 2020 and continued after an organisational transition.Read More
Reliable Power for 24/7 Breakdown Recovery Operations
A returning vehicle-recovery customer in north-east England needed standby electricity for round-the-clock operations, including communications and recovery equipment.Read More
Upgrading Critical Power Infrastructure in the North West
A working transport facility in north-west England needed to retire a 1950s Lister Blackstone generator. Missing weight information complicated removal planning, while restricted site access required careful scheduling.Read More
Delivering a Fully-Specified 550 kVA Generator for an Energy Solutions Provider in Scotland
An energy-solutions business in Scotland ordered a 550kVA C550D5Q housed in an acoustic container, with specific electrical and mechanical modifications.Read More
Fast-Track Generator Supply for Repeat Customer
A Scottish commercial customer returned for two Perkins-powered YXP150RS generators rated at 150kVA, having bought the same model within the previous six months.Read More
Cummins C550D5 Generator for Engineering Project in Scotland
An engineering contractor selected YorPower through tender for a Scottish east-coast installation. The specified Cummins C550D5 needed protection from a saline coastal environment.Read More
YorPower Provides Backup Power for a Leading Chemical Company
A biosolutions chemical manufacturer needed standby power for five production machines after costly outages. Following a factory visit, it selected a Perkins-powered YTP135RSC.Read More
YorPower Supplies Bespoke Generator Solution for UK Construction Company
A UK construction company required backup generation for two separate critical supplies, together with custom components to suit its site arrangement.Read More
Airfield
A Welsh airfield needed a lasting replacement for a generator enclosure damaged by coastal salt corrosion. Earlier steel canopies had already been replaced twice.Read More
Keadby Pumping Station
Keadby pumping station formed part of a £140million Environment Agency repair programme in 2020. The site protects about 15,000 homes across parts of North Lincolnshire, South Yorkshire and North Nottinghamshire.Read More
Coastal Seafood Plant
Coastal Seafoods in Karachi required rapid delivery and flexible commercial terms for standby power. Established in 1963, the plant reports freezing capacity of 40 tonnes daily and exports exceeding 200 containers annually.Read More
The Langham Hotel
London's Langham Hotel commissioned a replacement standby system for life-safety services, with difficult plant-room access and strict guest-noise requirements.Read More
Interxion
Interxion needed standby capacity for a central-London data centre in a building without suitable ground-floor space. The detailed specification describes five MTU-powered sets rated at 2,250kVA prime, although the source's product heading gives a different figure.Read More
Foss Barrier
After the December 2015 floods, York's Foss Barrier required stronger pumping capacity and standby generation above flood level. The scheme uses a movable gate and eight pumps to transfer water into the Ouse.Read More
Bank of New York Mellon
A Manchester bank data centre required a rooftop standby system: two containerised 1,800kVA MTU sets operating in parallel with N+1 redundancy. Assembly was ready eighteen weeks after approval and procurement.Read More