Bespoke 400kVA Generator Installation for Renewable Energy Company in Yorkshire
A Yorkshire renewable-energy business needed a higher-capacity replacement integrated into its existing installation, with practical access for cabling and maintenance.Read More
100kVA Cummins Backup Power for Berkshire Property Development
A Berkshire property developer needed commercial standby generation with switching arrangements for critical and life-safety applications. An electrical-solutions partner with previous Midlands projects coordinated the requirement.Read More
Cummins C550D5 Generator for Engineering Project in Scotland
An engineering contractor selected YorPower through tender for a Scottish east-coast installation. The specified Cummins C550D5 needed protection from a saline coastal environment.Read More
YorPower Provides Backup Power for a Leading Chemical Company
A biosolutions chemical manufacturer needed standby power for five production machines after costly outages. Following a factory visit, it selected a Perkins-powered YTP135RSC.Read More
YorPower Supplies Bespoke Generator Solution for UK Construction Company
A UK construction company required backup generation for two separate critical supplies, together with custom components to suit its site arrangement.Read More
Keadby Pumping Station
Keadby pumping station formed part of a £140million Environment Agency repair programme in 2020. The site protects about 15,000 homes across parts of North Lincolnshire, South Yorkshire and North Nottinghamshire.Read More
Coastal Seafood Plant
Coastal Seafoods in Karachi required rapid delivery and flexible commercial terms for standby power. Established in 1963, the plant reports freezing capacity of 40 tonnes daily and exports exceeding 200 containers annually.Read More
The Langham Hotel
London's Langham Hotel commissioned a replacement standby system for life-safety services, with difficult plant-room access and strict guest-noise requirements.Read More
Karbala Water Treatment Plant
Karbala's water-treatment infrastructure in Iraq needed dependable emergency electricity in a demanding environment. Site surveys beside the Euphrates informed equipment selection and the project design.Read More
Interxion
Interxion needed standby capacity for a central-London data centre in a building without suitable ground-floor space. The detailed specification describes five MTU-powered sets rated at 2,250kVA prime, although the source's product heading gives a different figure.Read More
Foss Barrier
After the December 2015 floods, York's Foss Barrier required stronger pumping capacity and standby generation above flood level. The scheme uses a movable gate and eight pumps to transfer water into the Ouse.Read More
Bank of New York Mellon
A Manchester bank data centre required a rooftop standby system: two containerised 1,800kVA MTU sets operating in parallel with N+1 redundancy. Assembly was ready eighteen weeks after approval and procurement.Read More